Remodeling and General Contracting in Atlanta, GA
Remodeling and Repairs Beyond the Floor
Planning a remodel?
Project Spotlight: A House Taken Back to Studs
Our work
We purchased this property in poor condition and rebuilt it with our own team. Because it was our own project, it's the clearest example of what our license and our team can deliver.
Structure and envelope
-
New subfloor throughout
-
New batt insulation throughout
-
New drywall throughout
-
All new vinyl windows and doors, interior and exterior
-
New gutters
-
New 12 by 24 foot wooden deck
-
New oversized driveway
-
Landscape lighting installed
Mechanical, electrical, plumbing
-
Two new Goodman HVAC units with new ductwork
-
Updated gas lines
-
Tankless water heater
-
All new PEX plumbing
-
Complete electrical rewire
-
Surge-protected panels
-
All new lighting fixtures
Interior finishes
- White oak engineered hardwood floors throughout
- New solid white oak stairs
-
New cabinetry with quartz countertops
-
Oversized kitchen island
-
Three fully renovated bathrooms
-
Glass shower enclosures
-
New tile in all bathrooms
How the Four Months Ran
TriArt Project Timeline
Demolition and permits
01
Down to studs, with every trade permit pulled through Cobb County before anything was rebuilt.
Mechanicals, then insulation and drywall
02
Complete rewire, new PEX, two HVAC units and ductwork, tankless water heater, updated gas lines. Sequence matters here: mechanicals go in before drywall closes the walls.
Subfloor, floors, stairs and cabinetry
03
New subfloor throughout, then white oak engineered and solid white oak stairs. Floors go down near the end so they are not walked on for three months.
Exterior and final inspection
04
New deck, oversized driveway, gutters, landscape lighting, and all new vinyl windows and doors. Every permit closed out before we finished.
Subfloor and Structural Work
What's under the floor
Subfloor work is the most common reason a flooring job becomes a contracting job.
What we find: board subfloors in older homes that have gaps or been patched badly, plywood delaminated under a long-term leak, sections softened by water that were never dried properly, and joists deflected enough to show as a dip in the finished floor.
A level subfloor is essential. A floor laid over one that moves will develop squeaks, gaps and loosened fasteners, which is why board repair only lasts when the subfloor beneath it is sound.
When the subfloor is sound, we'll tell you so. We recommend structural work only when your floor truly needs it.
How We Handle Scope That Grows
Changes approved in writing
Scope can grow on any contracting project. What matters is how it's handled.
We write and price the scope before we start. If we open a floor and find something unexpected, we pause, show you what we found, and you approve any change in writing before we continue. Nothing appears on your final invoice that you haven't already approved.
It's how we'd want our own homes handled, and it's why clients come back for their next project. The final walkthrough happens before final payment, not after.
Remodeling Questions
Before you hire
Are you a general contractor or a flooring company?
Both. TriArt is a licensed Georgia general contractor (RBCO008240) and flooring is most of what we do. The license lets us fix the subfloor, framing or plumbing a floor problem leads to, instead of handing you to another trade.
What kind of remodeling work do you actually take on?
Subfloor replacement and repair, structural repair from water damage, basement and lower-level work, including moisture assessment and subfloor systems, framing associated with stairs and transitions, and bathroom remodeling. Work that connects to a floor.
We think our floor problem might be the subfloor. How do we find out?
Send photos of the affected area and describe what you see or feel underfoot. Dips, sponginess, squeaks that move, and gaps that open and close seasonally all point to issues below the floor. We assess it in person before quoting because subfloor condition isn't knowable until the floor is open.
What happens if you find something unexpected once work has started?
Work stops and we show you. You get the finding, what it means for the scope, and a written price for the change before anything continues. Nothing gets added to the final invoice that you have not already approved.
Can you finish our basement?
The flooring side and the construction directly around it, yes. That includes slab moisture assessment, subfloor systems, leveling, transitions, and stair connections between levels.
Do you pull permits for remodeling work in metro Atlanta?
Yes, on every trade. Permitted work protects you at resale and gives you a documented record of what was done. Our own renovation went through full permitting with Cobb County, and the project is documented on our site.